The
replacement process is: This is hot swappable
1 – Power
off the cell server
2 – Oracle Engineer slides the cell out from the rack
3 – Oracle engineer removes the HBA card and inserts the new one
4 – Cell server is
powered back on
5 – Disk
sync is carried out
6 – Full
resilience is restored
There is no
interruption to service during the replacement.
No comments:
Post a Comment